Drive Mansions
G a t e s P r o j e c t - 2016
Bridges
The seven entrance bridges will have the existing bitumen layer and existing tiles removed.
The bridges will be repaired and waterproofed , then re-tiled with Victorian reproduction tiles with the pattern shown below.